logo
welcome
POWER Magazine

POWER Magazine

2-GW Offshore Grid Connection Takes Shape in the German Baltic Sea

POWER Magazine
Summary
Nutrition label

82% Informative

The Ostwind 4 project is the fourth offshore project designed to connect wind farm areas northeast of Rügen island to the German power grid.

Both an offshore converter platform and an onshore converter station will be built as part of the project.

The project involves the design, construction, and commissioning of a 2 -GW high-voltage direct-current (HVDC) electric transmission system.

Germany has an ambitious energy transition (Energiewende) framework, which aims to phase out coal entirely by 2030 and achieve net-zero emissions by 2045 .

Germany ’s Climate Law requires 80% of the country’ electricity supply to come from renewable sources by 2030 , with a target of 100% by 2035 .

VR Score

84

Informative language

84

Neutral language

62

Article tone

formal

Language

English

Language complexity

72

Offensive language

not offensive

Hate speech

not hateful

Attention-grabbing headline

not detected

Known propaganda techniques

not detected

Time-value

long-living

Source diversity

1

Affiliate links

no affiliate links